G. Finishing the Contract
GCC 74.1
|
[List out the Tests required On Completion of Contract or Refer any relevant Employer’s Requirement/Codes]
|
GCC 74.5
|
[insert additional clauses, if required]
|
GCC 74.12
|
[Insert the details of extent of the failure or minimum acceptable performance criteria under the Clause 74.12] or Refer the Employer’s Requirements. ]
|
GCC 75.1
|
[List out the Tests required after Completion of Contract or Refer any relevant Employer’s Requirement/Codes]
|
GCC 75.9
|
[Insert the details of extent of the failure or minimum acceptable performance criteria under the Clause 74.12] or Refer the Employer’s Requirements. ]
and
[Methods of Non-Performance Damage Calculation]
|
GCC 78.1
|
The date by which operating and maintenance manuals are required is; ………. [Insert date]
|
GCC 78.2
|
The date by which “as built” drawings are required is: …………[Insert date]
The amount to be withheld for failing to produce “as built” drawings and/or
Operating and maintenance manuals is: …………..[Insert Amount]
|
GCC 79.2 (l)
|
The maximum number of days is: 200
|
GCC 88.1
|
|