Standard bidding document


Section V - Eligible Countries



Download 318,41 Kb.
bet33/65
Sana31.12.2021
Hajmi318,41 Kb.
#262063
1   ...   29   30   31   32   33   34   35   36   ...   65
Bog'liq
EPC SBD NCB final

Section V - Eligible Countries


[This section contains the list of eligible countries. Select one option, either GoN Funded or DP Funded.]

  • For GoN funded: [with estimate upto NRs. 1 Billion]

For the purpose of ITB 4.2: “Nepal”; and

For the purpose of Country of Origin ITB 5.1 and GCC 79.2: “all Countries”

  • For DP funded: [attach list as per their list of eligible countries]


  • Part II : REQUIREMENTS


Section VI Employer’s Requirement (ERQ)

Section VII Activity Schedule (ACS)



Section VI - Employer’s Requirement (ERQ)


The Employer/ Public Entity shall describe its details requirement in this section. The minimum Employer’s Requirement are listed below but not limited to :

  • Project Summary

  • Scope of the project

  • Project Site Description

  • Project Components and its specific requirements

  • Design Criteria and Design Restrictions

  • Reference Specification and Codes for Design

  • Requirement of Design ReportsList of drawings

  • Design and drawing approval from Employer

  • Specification of Works

  • Major construction output including milestones

  • Warranty, operation and maintenance period and modality

  • List of Test during construction stage and/on Completion and Governing Codes/References

  • List of Test after Completion and Governing Codes/References

  • List of Test during operation and maintenance


Note: The Employer shall enlist milestones along with the conditions to be fulfilled for each activity by the bidder including measurable indicator and the timeline of the progress to achieve the milestone. The employer shall attach the study report, with the bidding document, based on which EPC procurement is being carried out. The Public Entity shall mention that the entity shall not be responsible to the accuracy of the study report. The Employer shall mention warranty, operation and maintenance period of at least Two Years, which can be extended depending on the nature of work. The modality during the period to be followed by the bidder shall also be mentioned.

Download 318,41 Kb.

Do'stlaringiz bilan baham:
1   ...   29   30   31   32   33   34   35   36   ...   65




Ma'lumotlar bazasi mualliflik huquqi bilan himoyalangan ©www.hozir.org 2024
ma'muriyatiga murojaat qiling

kiriting | ro'yxatdan o'tish
    Bosh sahifa
юртда тантана
Боғда битган
Бугун юртда
Эшитганлар жилманглар
Эшитмадим деманглар
битган бодомлар
Yangiariq tumani
qitish marakazi
Raqamli texnologiyalar
ilishida muhokamadan
tasdiqqa tavsiya
tavsiya etilgan
iqtisodiyot kafedrasi
steiermarkischen landesregierung
asarlaringizni yuboring
o'zingizning asarlaringizni
Iltimos faqat
faqat o'zingizning
steierm rkischen
landesregierung fachabteilung
rkischen landesregierung
hamshira loyihasi
loyihasi mavsum
faolyatining oqibatlari
asosiy adabiyotlar
fakulteti ahborot
ahborot havfsizligi
havfsizligi kafedrasi
fanidan bo’yicha
fakulteti iqtisodiyot
boshqaruv fakulteti
chiqarishda boshqaruv
ishlab chiqarishda
iqtisodiyot fakultet
multiservis tarmoqlari
fanidan asosiy
Uzbek fanidan
mavzulari potok
asosidagi multiservis
'aliyyil a'ziym
billahil 'aliyyil
illaa billahil
quvvata illaa
falah' deganida
Kompyuter savodxonligi
bo’yicha mustaqil
'alal falah'
Hayya 'alal
'alas soloh
Hayya 'alas
mavsum boyicha


yuklab olish